How much does it cost to pour 30×40 concrete?

How much does it cost to pour 30×40 concrete?

Cost of 30×40 Concrete Slab The average cost to pour a 30×40 concrete slab that is 6” thick with metal rebar reinforcements is between $8,196 and $12,384. This cost is based on a general purpose use such as a garage, whereas a foundation for a structure may cost more.

How much does it cost to build a 30×50 garage?

Concrete slabs generally cost between $4 and $8 per square foot including labor. A typical 30×50 concrete slab at 6 inches deep could cost around $9,000 depending on a number of factors including your building’s location.

How much does it cost to pour 30 yards of concrete?

On average, homeowners pay $117 per cubic yard of concrete, with a typical cost range between $104 and $144 per cubic yard….Cost Estimator by Amount of Concrete.

CUBIC YARDS AVERAGE COST TYPICAL COST RANGE
25 $2,080 $2,600 to $3,600
30 $2,240 $3,120 to $4,320

How much does it cost to pour a 30 by 30 slab?

Concrete slabs typically cost about $6 per square foot, or between $4 and $8 per square foot including labor. That’s about $5,400, or between $3,600 and $7,200 for a typical 30- by 30-foot slab that’s 6 inches deep. Materials alone cost about $4 per cubic foot.

How big can a concrete slab be without expansion joints?

Rule #1 – Keep joints as square as possible. Rule #2 – In order to prevent intermediate cracking, space joints (in feet) no more than 2 – 3 times the slab thickness (in inches).

How big is a yard of concrete 4 inches thick?

81 square feet
One Cubic Yard of Concrete: 4-inches thick – covers 81 square feet. 5-inches thick – covers 65 square feet. 6-inches thick – covers 54 square feet.

Is there a 30x40x10 steel building sale?

Every day is a steel building sale on 30 x 50 x 16 and more! Factory Steel Overstock offers wholesale to the public and allows You to select our profit. This is important building info for your 30x40x10 building. Building Model * Learn more about these models.

What is the volume of a 10×10 concrete patio?

Here’s what the math looks like for a 10’ by 10’ concrete patio: 10 x 10 = 100 square feet; 4 ÷ 12 = .33; 100 x .33 = 33 cubic feet; 33 x .037 = 1.22 cubic yards; Essentially you are solving for volume and then converting to cubic yards. For concrete, the formula for volume is as follows: length x width x thickness.

How much concrete do I need for a 20 yard project?

A perfectly placed order of concrete will finish the job with a small amount left over. A 20 cubic yard order with 1 cubic yard left over is a good order. A 20 cubic yard order that comes up cubic yard short is not a good order. Three steps to ordering enough concrete:

How many cubic yards in a 40 pound bag of concrete?

Essentially you are solving for volume and then converting to cubic yards. For concrete, the formula for volume is as follows: length x width x thickness. To determine how many bags of concrete you will need, divide the total cubic yards needed by the yield. Use the following yields per each bag size: 40 pound bag yields .011 cubic yards