What is a Delta first article?
A Delta FAI, or partial FAI, is done when there is a change in the manufacturing process. A partial or Delta FAI is required when: A change in design potentially affects form, fit, or function. A change in manufacturing source, process, inspection method, location of manufacture, tooling, or material.
What is included in a first article inspection?
A first article inspection (FAI) is a design verification and design history file and a formal method of providing a reported measurement for each manufactured feature of a part or assembly. Typically the supplier performs the FAI and the purchaser reviews or approves the report.
How do I fill out a first article inspection report?
How to Create a First Article Inspection Report in 5 Steps
- Step 1: Pre-plan your FAI. Before beginning, gather the documentation needed for your First Article Inspection:
- Step 2: Create an inspection plan.
- Step 3: Manufacture the part.
- Step 4: Collect data.
- Step 5: Create report.
What is the first article?
First article means the first one of any production component of a particular core system or subsystem that is produced. The Contract Documents provide that production components not be manufactured prior to drawing approval, so the First Article shall have been made to Approved drawings.
What is a AS9102 FAI?
An AS9102 FAIR, or First Article Inspection Report, certifies that each sample was produced and inspected according to the customer’s specifications. AS9102 First Articles used by the aerospace and defense industries include 3 forms: Part Number Accountability, Product Accountability, and Characteristic Accountability.
What is AS9102 standard?
AS9102 is the standard that details a first article inspection. In the Aerospace and Defense industry when a new or revised part is produced for the first time, it must be verified to ensure all requirements have been met.
Who performs a first article inspection?
supplier
A first article inspection occurs when an authorized person — typically the supplier or a second-party inspector with a laboratory and specialized measuring equipment — takes one or several parts from the first production run. They then compare them to the client specifications to verify they match exactly.
What is AS9102 first article inspection?
– AS9100 Store What is AS9102 First Article Inspection? In the AS&D industry, when a new or revised part is produced for the first time, it must be verified to ensure all requirements have been met.
How to fill out AS9102 form 1?
AS9102 Form 1 Instructions (See form on next page. Items in red are required entries) 1. Part number as ordered on GDOTS Purchase Order. 2. Part name as ordered on GDOTS Purchase Order. 3. If a serial number exists, enter serial number of part from which actual data was measured. 4. FAI report number inputted here, if one exists.
How do I report a Delta FAI on Form 1?
For an AS9102 Delta FAI, it should be noted in box 14 on Form 1, with the baseline part number and reason for Partial FAI. When is a first article inspection required?
Where do I put fai on AS9102?
For an AS9102 Delta FAI, it should be noted in box 14 on Form 1, with the baseline part number and reason for Partial FAI. When is a first article inspection required? A First Article Inspection (FAI) is an official authentication method for a manufacturing process.