What is the best part of the Silver Comet Trail?
The creek crosses underneath the path three times within the national forest so the bridges at those spots provide some great waterscapes. In regard to scenery, many folks consider the span that includes the Paulding Forest WMA and the Brushy Mountain Tunnel to be the best part of the Silver Comet Trail.
How long does it take to ride the Silver Comet Trail?
At 61.5 miles, the Silver Comet is a long trail, but with a smooth paved surface and minimal intersections, the route can be biked in one or two days by those who are ambitious. While the trail is relatively flat, especially at the eastern end, the western end does have some rolling hills.
Where do I start the Silver Comet Trail?
Mavell Road Trailhead
The Silver Comet Trail is 61.5 miles long, and starts at the Mavell Road Trailhead in Smyrna, Georgia. It ends at the Georgia/Alabama state line, near Cedartown and The Esom Hill Trailhead.
Can you walk Silver Comet Trail?
The Silver Comet Trail is one of Georgia’s top trails for running, walking, cycling, or skating. It’s an epic-length, 61.5-mile trail that spans from the Atlanta suburbs in Smyrna to the Alabama border.
Are there bathrooms on the Silver Comet Trail?
Silver Comet Trail Description The well-maintained 61.5-mile trail is 12-foot wide and paved. Along the way are 17 wheelchair-accessible access points, 15 restrooms, 10 water fountains, and a variety of trailside services.
Can you ride Ebikes on the Silver Comet Trail?
They are completely legal for trails, paths & the Atlanta Beltline.
Are electric bikes allowed on the Beltline?
ARE E-BIKES ALLOWED ON BICYCLE TRAILS AND THE BELTLINE? Of course! They are completely legal for trails, paths & the Atlanta Beltline.
Can you ride an electric bike on a cycle path?
Electric bikes are also subject to the same road laws as other bikes. For example, it is legal to ride a bike or e-bike on cycle paths and shared-use paths, as well as on the road.
Can you ride Ebikes on the Silver Comet trail?
What is the longest paved bike trail?
Longest Rail-Trails in America
- Katy Trail State Park — Missouri: 240 miles.
- Palouse to Cascades States Park Trail — Washington: 229 miles.
- Cowboy Trail — Nebraska: 219 miles.
- Great Allegheny Passage — Maryland & Pennsylvania: 150 miles.
- Soo Line Trail – Northern Route — Minnesota: 148 miles.
Where does the Silver Comet Trail start and end?
The Silver Comet Trail is 61.5 miles long, and starts at the Mavell Road Trailhead in Smyrna, Georgia. It ends at the Georgia/Alabama state line, near Cedartown and The Esom Hill Trailhead. At the Georgia/Alabama state line, the Silver Comet connects to the 33-mile long Chief Ladiga Trail.
Are the Silver Comet Trail and Chief Ladiga Trail paved?
Both the Silver Comet Trail and Chief Ladiga are fully paved rail-trails built on abandoned railroad lines. The combined Silver Comet and Chief Ladiga trail length is estimated to be 94.5 paved miles from Smyrna, Georgia to Anniston, Alabama.
What is the Silver Comet train?
From 1947 to 1969, the shiny Silver Comet passenger train provided luxury service between New York and Birmingham. Today, three trestles and a railroad tunnel integrated into the trail design hint at past glories.
Where are the best Silver Comet Trail sights near Smyrna?
Here are seven Silver Comet Trail sights you don’t want to miss! Stop at this park in Mableton to explore an extensive native plant garden, vibrant wetlands and historic mill ruins near Smyrna’s Concord Covered Bridge.